(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
AMJ Series drain separators for vacuums that are capable of single-action element replacement.
[Features]
· Removes water droplets from air by simply installing in vacuum lines.
· Prevents malfunction of vacuum pumps and ejectors.
· Over 90% of water droplets can be removed using a dedicated element.
· The provision of a drain cock makes it possible to discharge the drain manually after breaking the vacuum.
· Even when the element is saturated with water, there is almost no drop in pressure (increase in resistance).
Part Number
Configured Part Number is shown.
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Size | Thread type | Port Size | Accessories | Case options | Drain outlet options | Flow direction options | Recommended flow rate (L/min (ANR)) |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
MYR 524.87 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 1/4 | No | Polycarbonate case | With drain cock | Left > Right | 200 | ||
MYR 597.27 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 1/4 | No | Metal case | With drain cock | Left > Right | 200 | ||
MYR 524.87 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 1/4 | No | Polycarbonate case | With drain cock | Right → Left | 200 | ||
MYR 542.97 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 1/4 | Bracket | Polycarbonate case | With drain cock | Left > Right | 200 | ||
MYR 615.37 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 1/4 | Bracket | Metal case | With drain cock | Left > Right | 200 | ||
MYR 579.15 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 1/4 | Bracket | Metal case | Drain guide (1/4 female thread) | Left > Right | 200 | ||
MYR 579.15 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 1/4 | Bracket | Metal case | Drain guide (1/4 female thread) | Right → Left | 200 | ||
MYR 567.23 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 1/4 | Bracket | Nylon case | With drain cock | Left > Right | 200 | ||
MYR 506.75 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 1/4 | Bracket | Polycarbonate case | Drain guide (1/4 female thread) | Left > Right | 200 | ||
MYR 524.87 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 3/8 | No | Polycarbonate case | With drain cock | Left > Right | 200 | ||
MYR 597.27 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 3/8 | No | Metal case | With drain cock | Left > Right | 200 | ||
MYR 597.27 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 3/8 | No | Metal case | With drain cock | Right → Left | 200 | ||
MYR 542.97 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 3/8 | Bracket | Polycarbonate case | With drain cock | Left > Right | 200 | ||
MYR 579.15 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 3/8 | Bracket | Metal case | Drain guide (1/4 female thread) | Left > Right | 200 | ||
MYR 506.75 | 1 Piece(s) | 21 Day(s) | 30 | Rc | 3/8 | Bracket | Polycarbonate case | Drain guide (1/4 female thread) | Left > Right | 200 | ||
MYR 524.87 | 1 Piece(s) | 21 Day(s) | 30 | G | 1/4 | No | Polycarbonate case | With drain cock | Left > Right | 200 | ||
MYR 524.87 | 1 Piece(s) | 21 Day(s) | 30 | G | 3/8 | No | Polycarbonate case | With drain cock | Left > Right | 200 | ||
MYR 597.27 | 1 Piece(s) | 21 Day(s) | 30 | G | 3/8 | No | Metal case | With drain cock | Left > Right | 200 | ||
MYR 372.29 | 1 Piece(s) | 17 Day(s) or more | 30 | G | 3/8 | No | Polycarbonate case | Drain guide (1/4 female thread) | Left > Right | 200 | ||
MYR 524.87 | 1 Piece(s) | 21 Day(s) | 30 | NPT | 1/4 | No | Polycarbonate case | With drain cock | Left > Right | 200 | ||
MYR 417.84 | 1 Piece(s) | 17 Day(s) or more | 30 | NPT | 1/4 | No | Nylon case | With drain cock | Left > Right | 200 | ||
MYR 542.97 | 1 Piece(s) | 21 Day(s) | 30 | NPT | 1/4 | Bracket | Polycarbonate case | With drain cock | Left > Right | 200 | ||
MYR 615.37 | 1 Piece(s) | 21 Day(s) | 30 | NPT | 1/4 | Bracket | Metal case | With drain cock | Left > Right | 200 | ||
MYR 506.75 | 1 Piece(s) | 21 Day(s) | 30 | NPT | 1/4 | Bracket | Polycarbonate case | Drain guide (1/4 female thread) | Left > Right | 200 | ||
MYR 542.97 | 1 Piece(s) | 21 Day(s) | 30 | NPT | 3/8 | Bracket | Polycarbonate case | With drain cock | Left > Right | 200 | ||
MYR 579.15 | 1 Piece(s) | 21 Day(s) | 30 | NPT | 3/8 | Bracket | Metal case | Drain guide (1/4 female thread) | Left > Right | 200 | ||
MYR 387.08 | 1 Piece(s) | 17 Day(s) or more | 30 | NPT | 3/8 | Bracket | Polycarbonate case | Drain guide (1/4 female thread) | Left > Right | 200 | ||
MYR 609.18 | 1 Piece(s) | 21 Day(s) | 40 | Rc | 3/8 | No | Polycarbonate case | With drain cock | Left > Right | 300 | ||
MYR 633.45 | 1 Piece(s) | 21 Day(s) | 40 | Rc | 3/8 | Bracket | Polycarbonate case | With drain cock | Left > Right | 300 | ||
MYR 669.65 | 1 Piece(s) | 21 Day(s) | 40 | Rc | 3/8 | Bracket | Metal case | Drain guide (1/4 female thread) | Left > Right | 300 | ||
MYR 705.87 | 1 Piece(s) | 21 Day(s) | 40 | Rc | 3/8 | Bracket | Metal case | With drain cock | Right → Left | 300 | ||
MYR 639.63 | 1 Piece(s) | 21 Day(s) | 40 | Rc | 3/8 | Bracket | Nylon case | Drain guide (1/4 female thread) | Left > Right | 300 | ||
MYR 462.72 | 1 Piece(s) | 7 Day(s) or more | 40 | Rc | 3/8 | Bracket | Polycarbonate case | Drain guide (1/4 female thread) | Left > Right | 300 | ||
MYR 609.18 | 1 Piece(s) | 21 Day(s) | 40 | Rc | 1/2 | No | Polycarbonate case | With drain cock | Left > Right | 300 | ||
MYR 681.58 | 1 Piece(s) | 21 Day(s) | 40 | Rc | 1/2 | No | Metal case | With drain cock | Left > Right | 300 | ||
MYR 471.54 | 1 Piece(s) | 22 Day(s) or more | 40 | Rc | 1/2 | No | Polycarbonate case | With drain cock | Right → Left | 300 | ||
MYR 633.45 | 1 Piece(s) | 21 Day(s) | 40 | Rc | 1/2 | Bracket | Polycarbonate case | With drain cock | Left > Right | 300 | ||
MYR 705.87 | 1 Piece(s) | 21 Day(s) | 40 | Rc | 1/2 | Bracket | Metal case | With drain cock | Left > Right | 300 | ||
MYR 705.87 | 1 Piece(s) | 21 Day(s) | 40 | Rc | 1/2 | Bracket | Metal case | With drain cock | Right → Left | 300 | ||
MYR 597.27 | 1 Piece(s) | 21 Day(s) | 40 | Rc | 1/2 | Bracket | Polycarbonate case | Drain guide (1/4 female thread) | Left > Right | 300 | ||
MYR 609.18 | 1 Piece(s) | 21 Day(s) | 40 | G | 3/8 | No | Polycarbonate case | With drain cock | Left > Right | 300 | ||
MYR 609.18 | 1 Piece(s) | 21 Day(s) | 40 | G | 1/2 | No | Polycarbonate case | With drain cock | Left > Right | 300 | ||
MYR 469.63 | 1 Piece(s) | 17 Day(s) or more | 40 | G | 1/2 | No | Polycarbonate case | With drain cock | Right → Left | 300 | ||
MYR 609.18 | 1 Piece(s) | 21 Day(s) | 40 | NPT | 1/2 | No | Polycarbonate case | With drain cock | Left > Right | 300 | ||
MYR 681.58 | 1 Piece(s) | 21 Day(s) | 40 | NPT | 1/2 | No | Metal case | With drain cock | Right → Left | 300 | ||
MYR 633.45 | 1 Piece(s) | 21 Day(s) | 40 | NPT | 1/2 | Bracket | Polycarbonate case | With drain cock | Left > Right | 300 | ||
MYR 597.27 | 1 Piece(s) | 21 Day(s) | 40 | NPT | 1/2 | Bracket | Polycarbonate case | Drain guide (1/4 female thread) | Left > Right | 300 | ||
MYR 462.72 | 1 Piece(s) | 17 Day(s) or more | 40 | NPT | 1/2 | Bracket | Polycarbonate case | Drain guide (1/4 female thread) | Right → Left | 300 | ||
MYR 850.65 | 1 Piece(s) | 21 Day(s) | 50 | Rc | 3/4 | No | Polycarbonate case | With drain cock | Left > Right | 500 | ||
MYR 923.07 | 1 Piece(s) | 21 Day(s) | 50 | Rc | 3/4 | No | Metal case | With drain cock | Left > Right | 500 | ||
MYR 886.83 | 1 Piece(s) | 21 Day(s) | 50 | Rc | 3/4 | Bracket | Polycarbonate case | With drain cock | Left > Right | 500 | ||
MYR 959.25 | 1 Piece(s) | 21 Day(s) | 50 | Rc | 3/4 | Bracket | Metal case | With drain cock | Left > Right | 500 | ||
MYR 923.07 | 1 Piece(s) | 21 Day(s) | 50 | Rc | 3/4 | Bracket | Metal case | Drain guide (1/4 female thread) | Left > Right | 500 | ||
MYR 959.25 | 1 Piece(s) | 21 Day(s) | 50 | Rc | 3/4 | Bracket | Metal case | With drain cock | Right → Left | 500 | ||
MYR 929.23 | 1 Piece(s) | 21 Day(s) | 50 | Rc | 3/4 | Bracket | Nylon case | With drain cock | Left > Right | 500 | ||
MYR 850.65 | 1 Piece(s) | 21 Day(s) | 50 | Rc | 1 | No | Polycarbonate case | With drain cock | Left > Right | 500 | ||
MYR 923.07 | 1 Piece(s) | 21 Day(s) | 50 | Rc | 1 | No | Metal case | With drain cock | Left > Right | 500 | ||
MYR 923.07 | 1 Piece(s) | 21 Day(s) | 50 | Rc | 1 | No | Metal case | With drain cock | Right → Left | 500 | ||
MYR 886.83 | 1 Piece(s) | 21 Day(s) | 50 | Rc | 1 | Bracket | Polycarbonate case | With drain cock | Left > Right | 500 | ||
MYR 959.25 | 1 Piece(s) | 21 Day(s) | 50 | Rc | 1 | Bracket | Metal case | With drain cock | Left > Right | 500 |
Loading...
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy