(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Gap checker for at-a-glance checking of whether the workpiece is placed correctly or not.
[Features]
· Without control unit.
· Allows you to intuitively know how much of a gap there is between the workpiece and the detecting surface.
· Allows you to change the settings and see the values change on the display.
· Energy-saving type, with air consumption reduced by 60%.
· Drainage resistance increased by 10 times or more.
[Applications]
· Checking the reference plane for the press fitting of shafts, confirmation of close contact with the reference plane for machining, and confirmation of close contact with the workpiece for machining.
Part Number
Configured Part Number is shown.
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Number of stations | Option | Detection distance (mm) | Piping specifications | Output specifications | Unit specification for pressure values | Cable |
|---|---|---|---|---|---|---|---|---|---|---|---|
MYR 1,144.63 | 1 Piece(s) | 21 Day(s) | 1 station | No bracket | 0.01 to 0.03 | Supply side (Rc1/8), detection side (ø4 single-action) | NPN 1 output | SI unit fixed | Straight cable | ||
MYR 1,164.50 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.01 to 0.03 | Supply side (Rc1/8), detection side (ø4 single-action) | NPN 1 output | SI unit fixed | Straight cable | ||
MYR 955.72 | 1 Piece(s) | 21 Day(s) | 1 station | No bracket | 0.01 to 0.03 | Supply side (Rc1/8), detection side (ø4 single-action) | NPN 1 output | SI unit fixed | None | ||
MYR 2,378.90 | 1 Piece(s) | 21 Day(s) | 2 stations | With Bracket | 0.01 to 0.03 | Supply side (Rc1/8), detection side (ø4 single-action) | NPN 1 output | SI unit fixed | Straight cable | ||
MYR 4,076.23 | 1 Piece(s) | 21 Day(s) | 4 stations | With Bracket | 0.01 to 0.03 | Supply side (Rc1/8), detection side (ø4 single-action) | NPN 1 output | SI unit fixed | None | ||
MYR 1,144.63 | 1 Piece(s) | 21 Day(s) | 1 station | No bracket | 0.01 to 0.03 | Supply side (Rc1/8), detection side (ø4 single-action) | PNP 1 output | With unit switching function | Straight cable | ||
MYR 1,164.50 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.01 to 0.03 | Supply side (Rc1/8), detection side (ø4 single-action) | PNP 1 output | With unit switching function | Straight cable | ||
MYR 1,164.50 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.01 to 0.03 | Supply side (Rc1/8), detection side (ø4 single-action) | PNP 1 output | SI unit fixed | Straight cable | ||
MYR 1,164.50 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.01 to 0.03 | Supply side (Rc1/8), detection side (ø4 single-action) | PNP 1 output | SI unit fixed | Right-angle cable | ||
MYR 975.55 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.01 to 0.03 | Supply side (Rc1/8), detection side (ø4 single-action) | PNP 1 output | SI unit fixed | None | ||
MYR 1,144.63 | 1 Piece(s) | 21 Day(s) | 1 station | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | Straight cable | ||
MYR 1,164.50 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | Straight cable | ||
MYR 2,339.17 | 1 Piece(s) | 21 Day(s) | 2 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | Straight cable | ||
MYR 2,339.17 | 1 Piece(s) | 21 Day(s) | 2 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | Right-angle cable | ||
MYR 2,408.92 | 1 Piece(s) | 21 Day(s) | 2 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | Centralized lead wire | ||
MYR 4,698.18 | 1 Piece(s) | 21 Day(s) | 4 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | Centralized lead wire (with bracket) | ||
MYR 1,144.63 | 1 Piece(s) | 21 Day(s) | 1 station | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | Straight cable | ||
MYR 1,164.50 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | Straight cable | ||
MYR 1,144.63 | 1 Piece(s) | 21 Day(s) | 1 station | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | Right-angle cable | ||
MYR 1,164.50 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | Right-angle cable | ||
MYR 955.72 | 1 Piece(s) | 21 Day(s) | 1 station | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | None | ||
MYR 2,339.17 | 1 Piece(s) | 21 Day(s) | 2 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | Straight cable | ||
MYR 2,378.90 | 1 Piece(s) | 21 Day(s) | 2 stations | With Bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | Straight cable | ||
MYR 2,448.63 | 1 Piece(s) | 21 Day(s) | 2 stations | With Bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | Centralized lead wire | ||
MYR 4,792.65 | 1 Piece(s) | 21 Day(s) | 4 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | Right-angle cable | ||
MYR 4,832.40 | 1 Piece(s) | 21 Day(s) | 4 stations | With Bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | Right-angle cable | ||
MYR 4,698.18 | 1 Piece(s) | 21 Day(s) | 4 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | Centralized lead wire (with bracket) | ||
MYR 1,144.63 | 1 Piece(s) | 21 Day(s) | 1 station | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | With unit switching function | Straight cable | ||
MYR 1,164.50 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | With unit switching function | Straight cable | ||
MYR 2,339.17 | 1 Piece(s) | 21 Day(s) | 2 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | With unit switching function | Straight cable | ||
MYR 1,144.63 | 1 Piece(s) | 21 Day(s) | 1 station | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Straight cable | ||
MYR 1,164.50 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Straight cable | ||
MYR 1,144.63 | 1 Piece(s) | 21 Day(s) | 1 station | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Right-angle cable | ||
MYR 2,339.17 | 1 Piece(s) | 21 Day(s) | 2 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Straight cable | ||
MYR 2,378.90 | 1 Piece(s) | 21 Day(s) | 2 stations | With Bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Straight cable | ||
MYR 2,339.17 | 1 Piece(s) | 21 Day(s) | 2 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Right-angle cable | ||
MYR 2,378.90 | 1 Piece(s) | 21 Day(s) | 2 stations | With Bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Right-angle cable | ||
MYR 1,960.87 | 1 Piece(s) | 21 Day(s) | 2 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | None | ||
MYR 2,408.92 | 1 Piece(s) | 21 Day(s) | 2 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Centralized lead wire | ||
MYR 2,433.63 | 1 Piece(s) | 21 Day(s) | 2 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Centralized lead wire (with bracket) | ||
MYR 2,473.35 | 1 Piece(s) | 21 Day(s) | 2 stations | With Bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Centralized lead wire (with bracket) | ||
MYR 3,618.02 | 1 Piece(s) | 21 Day(s) | Triple | With Bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Straight cable | ||
MYR 3,011.05 | 1 Piece(s) | 21 Day(s) | Triple | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | None | ||
MYR 3,553.55 | 1 Piece(s) | 21 Day(s) | Triple | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Centralized lead wire | ||
MYR 3,578.28 | 1 Piece(s) | 21 Day(s) | Triple | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Centralized lead wire (with bracket) | ||
MYR 4,832.40 | 1 Piece(s) | 21 Day(s) | 4 stations | With Bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Straight cable | ||
MYR 4,036.05 | 1 Piece(s) | 21 Day(s) | 4 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | None | ||
MYR 4,673.03 | 1 Piece(s) | 21 Day(s) | 4 stations | No bracket | 0.02 to 0.15 | Supply side (Rc1/8), detection side (ø6 one-touch) | PNP 1 output | SI unit fixed | Centralized lead wire | ||
MYR 1,164.50 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.02 to 0.15 | Supply side (G1/8), detection side (G1/8) | NPN 1 output | With unit switching function | Right-angle cable | ||
MYR 1,164.50 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.05 to 0.30 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | Straight cable | ||
MYR 1,167.15 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.05 to 0.30 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | Right-angle cable | ||
MYR 955.72 | 1 Piece(s) | 21 Day(s) | 1 station | No bracket | 0.05 to 0.30 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | None | ||
MYR 2,339.17 | 1 Piece(s) | 21 Day(s) | 2 stations | No bracket | 0.05 to 0.30 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | Straight cable | ||
MYR 2,339.17 | 1 Piece(s) | 21 Day(s) | 2 stations | No bracket | 0.05 to 0.30 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | Right-angle cable | ||
MYR 3,578.28 | 1 Piece(s) | 21 Day(s) | Triple | No bracket | 0.05 to 0.30 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | Straight cable | ||
MYR 3,578.28 | 1 Piece(s) | 21 Day(s) | Triple | No bracket | 0.05 to 0.30 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | Centralized lead wire (with bracket) | ||
MYR 7,282.35 | 1 Piece(s) | 21 Day(s) | 6 stations | With Bracket | 0.05 to 0.30 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | With unit switching function | Right-angle cable | ||
MYR 1,144.63 | 1 Piece(s) | 21 Day(s) | 1 station | No bracket | 0.05 to 0.30 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | Straight cable | ||
MYR 1,164.50 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.05 to 0.30 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | Straight cable | ||
MYR 1,164.50 | 1 Piece(s) | 21 Day(s) | 1 station | With Bracket | 0.05 to 0.30 | Supply side (Rc1/8), detection side (ø6 one-touch) | NPN 1 output | SI unit fixed | Right-angle cable |
Loading...
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy