(!)Due to Microsoft's end of support for Internet Explorer 11 on 15/06/2022, this site does not support the recommended environment.
Large refrigerated air dryer with energy-saving design.
[Features]
· Refrigerated air dryer that protects pneumatic equipment from moisture.
· Removes the vapor from the moist compressed air delivered by the compressor, and prevents it from causing the pneumatic equipment to fail.
· Voltage (IDF190D-3): Three-phase: 200 V AC (50 Hz) / 200/220 V AC (60 Hz).
· Voltage (IDF190D-9): Three-phase different voltage (built-in transformer).
· Power supply voltage: 220 V / 380 V / 400 V / 415 V / 440 V.
Part Number
Configured Part Number is shown.
| Part Number | Standard Unit Price | Minimum order quantity | Volume Discount | Days to Ship | Method | Air Inlet Flow (l/min) | Inlet Air Temperature (℃) | Supply Side, Tube Flange Nominal | Control Side, Tube Flange Nominal | Power Supply Voltage | Air Compressor Size | Auto drain | Copper Tube Anti-rust Processing | Short-circuit Breaker |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
MYR 113,458.65 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 32,000 / 38,000 | 40 | [80] 80(3B) | [80] 80(3B) | Three-phase 200 V AC (50 Hz), 200/220 V AC (60 Hz) | 190 kW | None | None | None | ||
MYR 114,956.42 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 32,000 / 38,000 | 40 | [80] 80(3B) | [80] 80(3B) | Three-phase 200 V AC (50 Hz), 200/220 V AC (60 Hz) | 190 kW | With motor-type auto drain | None | None | ||
MYR 125,383.57 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (water-cooling specification) | 32,000 / 38,000 | 40 | [80] 80(3B) | [80] 80(3B) | Three-phase 200 V AC (50 Hz), 200/220 V AC (60 Hz) | 190 kW | None | None | None | ||
MYR 152,148.23 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 32,000 / 38,000 | 40 | [80] 80(3B) | [80] 80(3B) | Three-phase 220 V (built-in power transformer) | 190 kW | None | None | None | ||
MYR 159,591.30 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 32,000 / 38,000 | 40 | [80] 80(3B) | [80] 80(3B) | Three-phase 220 V (built-in power transformer) | 190 kW | None | Yes | None | ||
MYR 152,148.23 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 32,000 / 38,000 | 40 | [80] 80(3B) | [80] 80(3B) | Three-phase 380 V (built-in power transformer) | 190 kW | None | None | None | ||
MYR 159,591.30 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 32,000 / 38,000 | 40 | [80] 80(3B) | [80] 80(3B) | Three-phase 380 V (built-in power transformer) | 190 kW | None | Yes | None | ||
MYR 153,646.03 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 32,000 / 38,000 | 40 | [80] 80(3B) | [80] 80(3B) | Three-phase 380 V (built-in power transformer) | 190 kW | With motor-type auto drain | None | None | ||
MYR 152,148.23 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 32,000 / 38,000 | 40 | [80] 80(3B) | [80] 80(3B) | Three-phase 400 V (built-in power transformer) | 190 kW | None | None | None | ||
MYR 159,591.30 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 32,000 / 38,000 | 40 | [80] 80(3B) | [80] 80(3B) | Three-phase 400 V (built-in power transformer) | 190 kW | None | Yes | None | ||
MYR 152,148.23 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 32,000 / 38,000 | 40 | [80] 80(3B) | [80] 80(3B) | Three-phase 415 V (built-in power transformer) | 190 kW | None | None | None | ||
MYR 152,148.23 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 32,000 / 38,000 | 40 | [80] 80(3B) | [80] 80(3B) | Three-phase 440 V (built-in power transformer) | 190 kW | None | None | None | ||
MYR 159,591.30 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 32,000 / 38,000 | 40 | [80] 80(3B) | [80] 80(3B) | Three-phase 440 V (built-in power transformer) | 190 kW | None | Yes | None | ||
MYR 181,534.17 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 200 V AC (50 Hz), 200/220 V AC (60 Hz) | 240 kW | None | None | None | ||
MYR 188,977.20 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 200 V AC (50 Hz), 200/220 V AC (60 Hz) | 240 kW | None | Yes | None | ||
MYR 190,474.55 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 200 V AC (50 Hz), 200/220 V AC (60 Hz) | 240 kW | With motor-type auto drain | Yes | None | ||
MYR 196,011.48 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 200 V AC (50 Hz), 200/220 V AC (60 Hz) | 240 kW | With motor-type auto drain | Yes | Yes | ||
MYR 209,286.33 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (water-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 200 V AC (50 Hz), 200/220 V AC (60 Hz) | 240 kW | With motor-type auto drain | Yes | Yes | ||
MYR 194,809.02 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (water-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 200 V AC (50 Hz), 200/220 V AC (60 Hz) | 240 kW | None | None | None | ||
MYR 223,627.25 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 220 V (built-in power transformer) | 240 kW | None | None | None | ||
MYR 223,627.25 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 380 V (built-in power transformer) | 240 kW | None | None | None | ||
MYR 231,070.28 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 380 V (built-in power transformer) | 240 kW | None | Yes | None | ||
MYR 238,104.57 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 380 V (built-in power transformer) | 240 kW | With motor-type auto drain | Yes | Yes | ||
MYR 223,627.25 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 400 V (built-in power transformer) | 240 kW | None | None | None | ||
MYR 231,070.28 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 400 V (built-in power transformer) | 240 kW | None | Yes | None | ||
MYR 223,627.25 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 415 V (built-in power transformer) | 240 kW | None | None | None | ||
MYR 231,070.28 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (air-cooling specification) | 43,000 / 50,000 | 40 | [100] 100(4B) | [100] 100(4B) | Three-phase 440 V (built-in power transformer) | 240 kW | None | Yes | None | ||
MYR 272,301.23 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (water-cooling specification) | 54,000 / 65,000 | 35 | [150] 150(6B) | [150] 150(6B) | Three-phase 200 V AC (50 Hz), 200/220 V AC (60 Hz) | 370 kW | None | None | None | ||
MYR 335,384.15 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (water-cooling specification) | 54,000 / 65,000 | 35 | [150] 150(6B) | [150] 150(6B) | Three-phase 220 V (built-in power transformer) | 370 kW | None | None | None | ||
MYR 335,384.15 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (water-cooling specification) | 54,000 / 65,000 | 35 | [150] 150(6B) | [150] 150(6B) | Three-phase 380 V (built-in power transformer) | 370 kW | None | None | None | ||
MYR 335,384.15 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (water-cooling specification) | 54,000 / 65,000 | 35 | [150] 150(6B) | [150] 150(6B) | Three-phase 400 V (built-in power transformer) | 370 kW | None | None | None | ||
MYR 335,384.15 | 1 Piece(s) | 21 Day(s) | [Freezing Type] Refrigerating type (water-cooling specification) | 54,000 / 65,000 | 35 | [150] 150(6B) | [150] 150(6B) | Three-phase 440 V (built-in power transformer) | 370 kW | None | None | None |
Loading...
| Type | Dryer | Shape | Standard | Air Inlet Flow Rate [Distinction](l/min) | More than 5000 |
|---|---|---|---|---|---|
| Outlet Open Air Pressure Dew-point(℃) | 10 | Supply Side, Connection Type | Pipe flange | Inlet Air Pressure(MPa) | 0.7 |
| Control Side, Connection Type | Pipe flange |
How can we improve?
How can we improve?
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Customer Privacy Policy
Thank you for your cooperation.
While we are not able to respond directly to comments submitted in this form, the information will be reviewed for future improvement.
Please use the inquiry form.
Customer Privacy Policy